main content starts here

Construction at the High School Cafeteria

The full cafeteria is expected to be open to students and staff in early December 2019. New equipment will be brought in alongside existing equipment and hot meals will return after a brief absence. The cafeteria space will be arranged more efficiently for serving and a new staff break area will be included. In 2020, new architectural details will enhance the space that houses BC Blend and a BC Snacks area.

This slideshow requires JavaScript.