The proposed 2025 Capital Project includes improvements and upgrades for every school in the district. A full list of project elements, by building, can be found below:
- Eagle Elementary School
- Elsmere Elementary School
- Glenmont Elementary School
- Hamagrael Elementary School
- Slingerlands Elementary School
- BCMS
- BCHS
- Transportation
- Operations & Maintenance
Eagle Elementary School — Approx. 6.2% of project
- Membrane roof replacement
- Parking lot improvements
- Window screen and balance replacement
- Repair/replace damaged windows casings &
casework - Replace stairwell treads
- Air Conditioning: Add to gym and cafeteria
Elsmere Elementary School — Approx. 11.7% of project
- Library Media Center (LMC) renovation
- Classroom renovations (13 rooms)
- Fire alarm upgrades
- ADA ramp handrail replacement
- Bathroom renovations/upgrades
- Add fence and gate to play area
- New exit stairs to play area from cafeteria
- Boiler plant replacement
- Door replacements – cafeteria and gym
- Loading dock door replacement
- Storage door & frame replacement
- Air conditioning: Add to all 2nd-floor classrooms, gym, LMC and cafeteria
Glenmont Elementary School — Approx. 9.0% of project
- Classroom renovations (11 rooms, incl. hallways & bathrooms)
- Fire alarm system replacement
- Exterior insulation repair
- Fifth-grade corridor abatement and reinsulation
- Window screen replacement
- Boiler room door replacement
- Gym door replacement
- Skylight repairs
- Air conditioning: Add to to Library Media Center (LMC) and cafeteria
Hamagrael Elementary School — Approx. 11.4% of project
- Classroom renovations (15 rooms)
- Main office renovation/expansion
- Gym/cafe renovations
- Art Room casework repair
- Stage floor refinishing
- Fire alarm upgrades
- Room 71 renovation to create a psychologist’s office
- Door repair/replacements
- Front canopy refurbishment
- Skylight repairs
- Air conditioning: Add to Library Media Center (LMC) and cafeteria, health office, faculty room and data/technology closet
Slingerlands Elementary School — Approx. 12.7% of project
- Classroom renovations – 6 rooms
- Cafeteria and kitchen renovations
- Roof replacement where needed
- Eliminate steep grade from play area to fields
- Bathroom renovations (two areas)
- Fire alarm upgrades
- Main corridor refurbishment
- Exterior canopy replacement
- Storage shed replacement
- Exterior window repair
- Window screen replacement
- Boiler plant replacement
- Boiler room masonry repair
- Door replacements
- Air conditioning: Add to Library Media Center (LMC) and gym
Bethlehem Central Middle School — Approx. 19.9% of project
- Art room renovations
- Bathroom renovations
- Girls’ Pool Locker Room renovations
- Main entrance wood door replacements
- Fire alarm system replacement
- Music room relocation from lower level
- Window screen replacement
- Roof replacement where needed
- Cafeteria folding partition replacement
- Tech Room flooring repairs
- Interior door replacements and repairs
- Serving line coiling door replacements
- Worn stair tread replacement
- Pool ramp floor replacement
- Scoreboard and shot clock replacement – lower gym
- Science & Technology classroom new tables & chairs
- Elevator floor abatement and repair
- PE & Athletics renovations (pit area)
- Secondary boiler repair and replacement
- Dust collection system refurbishment
- Air conditioning: Add to all 2nd-floor classrooms, cafeteria, and upper and lower gyms
Bethlehem Central High School — Approx. 23.7% of project
- Computer Lab renovations
- Art room renovations (D225)
- D-Wing bathroom renovations
- Main Office renovations
- Public Announcement (PA) system upgrades
- Modernize D-Wing elevator
- Revamp existing F-Wing space for theater and music storage
- FACS classroom renovations
- Kiln room and photo lab repairs
- Bus lot and faculty parking lot repaving and striping
- Sidewalk repairs
- Gym C scoreboard/shot clock replacement
- Fence replacement around stadium & track
- Memorial Veterans’ Flag Memorial refurbishment
- Field 5 storm structure improvements
- Window screen replacement
- Ventilation improvements (G122 to G127)
- Water heater upgrades
- B-Gym electrical panel replacement
- Data rack relocation
- Art room lighting improvements (D222, D224)
- Auto shop and wood shop repairs
- Roof replacement where needed
- Flooring abatement/replacement where needed
- Scoreboard replacement and shot clock addition at football stadium
- Exterior insulation system cleaning/painting
- Exterior door replacement at pool area
- Air conditioning: Add to all D-E Wing 2nd floor classrooms, cafeteria & gyms A, B, & C
Transportation — Approx. 4.4% of project
- Parking lot refurbishment
- Bus lift replacement – Bay 7
- Bus parking drainage repairs
- Overhead door replacement
- Bathroom renovations
- Hot water heater replacement
- Electrical upgrades – bus wash
Operations & Maintenance — Approx. 1.0% of project
- Resurface parking lot and install washdown pad
- Install material coffers